Test Sections on the route 7
July 22 2011

A test section was paved on the route 7 in the south of Chile, near the El Toqui mine. 4 different alternatives were proved, a 5 inch thickness normal slab, and three fiber reinforced 4.5 inch concrete slabs. Two used plastic fiber while the other used  metal based fiber. The objective of this test section is to prove which alternative is the best solution for using TCP technology in other roads of the route 7.

 

Other News
Ruta 7, Cerro Castillo - Laguna verde, Project review
August 19 2020

We made a technical visit to the recently built Ruta 7, Cerro Castillo - Laguna Verde project. ...

Project review: Conañaripe - Pellaifa
September 23 2019

In September, a technical visit was made to the section of the international route between ...

Industrial project in Colombia
May 15 2019

In the month of May 2019, there was a technical visit to the pavement of a brewing ...