(56 2) 2 658 13 21 - (56 2) 2 658 13 22
Ruta 7, Cerro Castillo - Laguna verde, Project review
August 19 2020

We made a technical visit to the recently built Ruta 7, Cerro Castillo - Laguna Verde project. This project extends the paving of Route 7 in ...

Project in the Atacama desert
February 05 2018

To the south of Antofagasta, a section of Route 5 was paved with TCP technology, between Los ...

First TCP project in Mexico
December 20 2017

The TCP projet corresponds to the exterior pavements of the Sohnen plant in Tijuana, Mexico, ...

UTCP - The first contract by direct administration
August 29 2017

In the Bío Bío region, the first project of Ultra Thin Concrete pavements was ...

TCP and Lafarge Holcim
July 17 2017

With the support of TCPavements technology, LafargeHolcim is introducing a pavement ...

OptiPave2 officially incorporated in the ACI 330.2R-17
Jun 14 2017

The design method of TCPavements was officialized in the ACI 330.2R-17 for the design and ...

First project in the United States
May 25 2017

During April, the paving of the Fricks' Pallet Plant project, located in the state of Texas, ...

1 2 3 4 5 6